USC Watt Hall, Los Angeles- Project consisted of converting Watt Hall from a 2 story building into a 3 story building for new office space.  G.D. Heil was responsible for removing over 22,000 sf of 12” topping slab throughout the roof.  This included taking everything down to the existing structural slab.  G.D. Heil also removed the entire perimeter parapet wall which was over 600 lf of 8” concrete wall.  We utilized a 365 ton crane and wall sawed the parapet in sections.  Special items of demolition were several large openings that were cut in the existing 18” thick structural slabs. Client-Matt Construction

Hollywood Galaxy Theatre, Los Angeles- Project consisted of converting the existing Hollywood Galaxy Movie Theatre into an L.A. Fitness.  G.D. Heil was responsible for bringing the existing theatre to a “shell” condition.  The theatre was over 45,000 sf.  G.D. Heil was also responsible for removing the existing 12” concrete topping slabs and metal decks that were in place in all of the existing theatres. Client-CIM Group

GTE E-Solutions Structural Upgrades, Los Angeles - Remove 93,000 sf topping slab on the 3rd floor of the USPS Terminal Annex Building. Drill 78,000 holes for reinforcing steel for new structural deck.

Rocketdyne Building 20, Santa Susana Field Laboratories, Simi Hills - Wallsawed and removed concrete walls, slabs and foundations varying in thickness from 5 feet to 6 inches of an old radioactive fuel loading facility. Building contained low levels of radiation. Work done under DOE guidelines.
G.D. HEIL, INC.
DEMOLITION CONTRACTORS
(714) 687-9100 | (714) 687-9108 fax
License # 659496
1031 Segovia Circle, Placentia, CA 92870
H A R D   D E M O L I T I O N
USC Watt Hall, Los Angeles- Project consisted of converting Watt Hall from a 2 story building into a 3 story building for new office space.  G.D. Heil was responsible for removing over 22,000 sf of 12” topping slab throughout the roof.  This included taking everything down to the existing structural slab.  G.D. Heil also removed the entire perimeter parapet wall which was over 600 lf of 8” concrete wall.  We utilized a 365 ton crane and wall sawed the parapet in sections.  Special items of demolition were several large openings that were cut in the existing 18” thick structural slabs. Client-Matt Construction

Hollywood Galaxy Theatre, Los Angeles- Project consisted of converting the existing Hollywood Galaxy Movie Theatre into an L.A. Fitness.  G.D. Heil was responsible for bringing the existing theatre to a “shell” condition.  The theatre was over 45,000 sf.  G.D. Heil was also responsible for removing the existing 12” concrete topping slabs and metal decks that were in place in all of the existing theatres. Client-CIM Group

GTE E-Solutions Structural Upgrades, Los Angeles - Remove 93,000 sf topping slab on the 3rd floor of the USPS Terminal Annex Building. Drill 78,000 holes for reinforcing steel for new structural deck.

Rocketdyne Building 20, Santa Susana Field Laboratories, Simi Hills - Wallsawed and removed concrete walls, slabs and foundations varying in thickness from 5 feet to 6 inches of an old radioactive fuel loading facility. Building contained low levels of radiation. Work done under DOE guidelines.
H A R D   D E M O L I T I O N
USC Watt Hall, Los Angeles- Project consisted of converting Watt Hall from a 2 story building into a 3 story building for new office space.  G.D. Heil was responsible for removing over 22,000 sf of 12” topping slab throughout the roof.  This included taking everything down to the existing structural slab.  G.D. Heil also removed the entire perimeter parapet wall which was over 600 lf of 8” concrete wall.  We utilized a 365 ton crane and wall sawed the parapet in sections.  Special items of demolition were several large openings that were cut in the existing 18” thick structural slabs. Client-Matt Construction

Hollywood Galaxy Theatre, Los Angeles- Project consisted of converting the existing Hollywood Galaxy Movie Theatre into an L.A. Fitness.  G.D. Heil was responsible for bringing the existing theatre to a “shell” condition.  The theatre was over 45,000 sf.  G.D. Heil was also responsible for removing the existing 12” concrete topping slabs and metal decks that were in place in all of the existing theatres. Client-CIM Group

GTE E-Solutions Structural Upgrades, Los Angeles - Remove 93,000 sf topping slab on the 3rd floor of the USPS Terminal Annex Building. Drill 78,000 holes for reinforcing steel for new structural deck.

Rocketdyne Building 20, Santa Susana Field Laboratories, Simi Hills - Wallsawed and removed concrete walls, slabs and foundations varying in thickness from 5 feet to 6 inches of an old radioactive fuel loading facility. Building contained low levels of radiation. Work done under DOE guidelines.
H A R D   D E M O L I T I O N
USC Watt Hall, Los Angeles- Project consisted of converting Watt Hall from a 2 story building into a 3 story building for new office space.  G.D. Heil was responsible for removing over 22,000 sf of 12” topping slab throughout the roof.  This included taking everything down to the existing structural slab.  G.D. Heil also removed the entire perimeter parapet wall which was over 600 lf of 8” concrete wall.  We utilized a 365 ton crane and wall sawed the parapet in sections.  Special items of demolition were several large openings that were cut in the existing 18” thick structural slabs. Client-Matt Construction

Hollywood Galaxy Theatre, Los Angeles- Project consisted of converting the existing Hollywood Galaxy Movie Theatre into an L.A. Fitness.  G.D. Heil was responsible for bringing the existing theatre to a “shell” condition.  The theatre was over 45,000 sf.  G.D. Heil was also responsible for removing the existing 12” concrete topping slabs and metal decks that were in place in all of the existing theatres. Client-CIM Group

GTE E-Solutions Structural Upgrades, Los Angeles - Remove 93,000 sf topping slab on the 3rd floor of the USPS Terminal Annex Building. Drill 78,000 holes for reinforcing steel for new structural deck.

Rocketdyne Building 20, Santa Susana Field Laboratories, Simi Hills - Wallsawed and removed concrete walls, slabs and foundations varying in thickness from 5 feet to 6 inches of an old radioactive fuel loading facility. Building contained low levels of radiation. Work done under DOE guidelines.